LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Subaru >> 1994 >> Impreza Base >> Repair and Diagnosis >> Accessories & Equipment >> Cruise Control Systems >> Testing & Diagnosis >> Main Switch Test
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Main Switch Test

  1. Turn ignition on. Check voltage between fuse No. 4 and ground. Voltage should be 10-13 volts.
  2. Remove cruise control main switch and disconnect connector. With ignition on, measured voltage between harness connector terminal No. 3 and ground should be 10-13 volts. See Fig 1 .
    Fig 1: Testing Voltage At Main Switch Harness
    G93C84147Courtesy of SUBARU OF AMERICA, INC.
  3. To check function of main switch, measure resistance between terminals No. 3 and 5. Resistance should be less than 10 ohms with switch on and greater than one megohm with switch off. See Fig 2 .
  4. To check harness between main switch and control module, reconnect harness connector. Turn ignition and main switches on. Measure voltage by backprobing between specified terminals and ground:
    • Terminals No. 3 and 5 of connector i10.
    • Terminal No. 4 of connector B54.

Voltages should be 10-13 volts. See Fig 3 .

Fig 2: Measuring Resistance In Main Switch
G93D84148Courtesy of SUBARU OF AMERICA, INC.
Fig 3: Checking Harness Between Main Switch & Cruise Control Module
G93E84149Courtesy of SUBARU OF AMERICA, INC.