LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Scion >> 2012 >> tC L4-2.5L (2AR-FE) >> Repair and Diagnosis >> Powertrain Management >> Computers and Control Systems >> Information Bus >> Testing and Inspection >> Initial Inspection and Diagnostic Overview >> LIN Communication System
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

LIN Communication System





NETWORKING: LIN COMMUNICATION SYSTEM: HOW TO PROCEED WITH TROUBLESHOOTING

HINT
* Use these procedures to troubleshoot the LIN communication system.
* *: Use the Techstream.

1. VEHICLE BROUGHT TO WORKSHOP

NEXT -- Continue to next step.

2. INSPECT BATTERY VOLTAGE

Standard voltage:

11 to 14 V

If the voltage is below 11 V, recharge or replace the battery before proceeding.

NEXT -- Continue to next step.

3. INSPECT COMMUNICATION FUNCTION OF CAN COMMUNICATION SYSTEM*

(a) Using the Techstream, inspect the CAN communication function to make sure that there are no malfunctions in the communication system Diagnosis System.

Result





B -- Go to CAN COMMUNICATION SYSTEM How to Proceed With Troubleshooting
A -- Continue to next step.

4. INSPECT COMMUNICATION FUNCTION OF LIN COMMUNICATION SYSTEM*

(a) Using the Techstream, inspect the LIN communication function to make sure that there are no malfunctions in the communication system.

Result





B -- Go to DIAGNOSTIC TROUBLE CODE CHART LIN Communication System
A -- Continue to next step.

5. OVERALL ANALYSIS AND TROUBLESHOOTING*

(a) Data List/Active Test Scan Tool Testing and Procedures

(b) Terminals of ECU LIN Communication System

NEXT -- Continue to next step.

6. ADJUST, REPAIR OR REPLACE

NEXT -- Continue to next step.

7. CONFIRMATION TEST

NEXT -- END