LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Scion >> 2004 >> xA L4-1.5L (1NZ-FE) >> Repair and Diagnosis >> Powertrain Management >> Relays and Modules - Powertrain Management >> Relays and Modules - Computers and Control Systems >> Main Relay (Computer/Fuel System) >> Testing and Inspection
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Main Relay (Computer/Fuel System): Testing and Inspection

INSPECT EFI RELAY

a. Continuity inspection.







1. Using an ohmmeter, check for continuity between each terminal.

INSPECT CIRCUIT OPENING RELAY

a. Continuity inspection.







1. Using an ohmmeter, check for continuity between each terminal.