Hall Sending Unit Test (With Knock Control Unit)
- Perform Hall sending unit appropriateVOLTAGE SUPPLY CHECK . Turn ignition off. With 3-wire connector installed at distributor, move protective cover to gain access to rear of connector.
- Connect voltmeter across terminals No. 1 and 2 at rear of 3-wire connector. Remove coil high voltage lead and ground with jumper wire.
- Turn ignition switch to "START" position. Voltage should be indicated while starter is actuated.
- If voltmeter does not show voltage reading while cranking, replace Hall sending unit. If voltmeter shows voltage while cranking, check for same voltage readings at Hall control unit terminals No. 4 and 6.
- If readings are not identical, check wire harness from Hall sending unit to knock control unit and from knock control unit to Hall ignition control unit. See Fig 1.