Repair Procedures
Perform the Diagnostic Repair Verification after completing the diagnostic procedure.
- Generator Replacement (RPO LSJ) or Generator Replacement (RPOs L61/LE5)
- Control Module References for ECM/PCM replacement, setup, and programming
Perform the Diagnostic Repair Verification after completing the diagnostic procedure.