October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Powertrain Control Module: Installation
- Install harness connectors to PCM.
- Install PCM into air cleaner assembly.
- Install air cleaner assembly cover.
- Tighten air cleaner assembly cover retainers.
- Install left sheet metal diagonal brace to air cleaner assembly.
- Connect negative battery cable.
- If a new PCM is being installed, program EEPROM. See POWERTRAIN CONTROL MODULE under PROGRAMMING.
Courtesy of GENERAL MOTORS CORP.