LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Pontiac >> 1992 >> Grand Prix V6-191 3.1L >> Repair and Diagnosis >> Cruise Control >> Cruise Control Switch >> Testing and Inspection
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Cruise Control Switch: Testing and Inspection

Check for shorts to voltage in the wires to terminals G, A, M and L of the Cruise Control Module (see schematic).

^ If the wires are good, check for a poor connection. If OK, replace the Multi-Function Lever.