LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Oldsmobile >> 1985 >> Cutlass Cruiser 2.5 R >> Repair and Diagnosis >> Engine Performance >> Ignition System >> Ignition System - HEI-Est >> Testing >> Est System Check >> Fuel Injected Engines
October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.

Fuel Injected Engines

  1. The ECM will set timing at a specified value when the "Test" terminal is grounded. To check EST operation, timing should be checked at 2000 RPM with the terminal not grounded.
  2. Ground the "Test" terminal. If timing changes at 2000 RPM, the EST is operating.