LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 2017 >> Juke SL, FWD >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System (DTCS) (Except For NISMO RS Models) (2 Of 4) >> DTC/Circuit Diagnosis >> DTC P0234: TC System >> Component Function Check
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Component Function Check

  1. INSPECTION START

    Do you have CONSULT?

    Do you have CONSULT?

    YES 

    GO TO STEP 2  .

    NO 

    GO TO STEP 3  .

  2. CHECK ELECTRIC WASTEGATE CONTROL ACTUATOR

    G-20 With CONSULT

    1. Turn ignition switch ON and engine stopped.
    2. On the CONSULT screen, select "ENGINE">>"ACTIVE TEST">>"WASTEGATE ACTUATOR".
    3. Operate "Up" or "Down", set "W/G ACTUATOR POSITION B1" to 0.002 m, and make a quick short note of value "V1" of "W/G ACTUATOR POSI SEN B1".
    4. Operate "Up" or "Down", set "W/G ACTUATOR POSITION B1" to 0.006 m, and make a quick short note of value "V2" of "W/G ACTUATOR POSI SEN B1".

    Do the values of "V1" and "V2" change (visually, ACTUATOR SHAFT operates) and "V2" minus "V1" becomes equal to or more than 1.3V?

    YES 

    INSPECTION END

    NO 

    Replace Turbocharger Assembly (do not replace electric wastegate control actuator only). Refer to COMPONENT LOCATION .

  3. CHECK ELECTRIC WASTEGATE CONTROL ACTUATOR

    G-21 Without CONSULT

    1. Turn ignition switch OFF.
    2. Disconnect Wastegate control actuator harness connector.
    3. While checking the POSITION SENSOR OUT voltage with an oscilloscope, apply a voltage of 12 V to the positive or negative terminal.

    Does ACTUATOR SHAFT visually operate and POSITION SENSOR OUT voltage change?

    YES 

    INSPECTION END

    NO 

    Replace Turbocharger Assembly (do not replace electric wastegate control actuator only). Refer to COMPONENT LOCATION .