LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 2016 >> Leaf SV >> Repair and Diagnosis >> Body & Frame >> Windows >> Power Window Control System >> System Description >> System >> System Description >> Retained Power Operation
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Retained Power Operation

Retained power operation is an additional power supply function that enables power window system to operate for 45 seconds even when power switch is turned OFF.

RETAINED POWER CANCEL CONDITIONS: