LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 2005 >> Sentra Base, Automatic >> Repair and Diagnosis >> Engine Performance >> Engine Control System (QG18DE) >> Ignition Signal >> Component Inspection >> ECM Relay
October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.

ECM Relay

  1. Apply 12V direct current between ECM relay terminals 1 and 2.
  2. Check continuity between relay terminals 3 and 5, 6 and 7.
    Fig 1: Checking Continuity Between ECM Relay Terminals 3 And 5, 6 And 7
    G02450512Courtesy of NISSAN MOTOR CO., U.S.A.
    ECM RELAY TERMINAL CONTINUITY

    Condition Continuity
    12V direct current supply between terminals 1 and 2 Yes
    OFF No
  3. If NG, replace ECM relay.