LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 2004 >> Sentra SE-R >> Repair and Diagnosis >> External Pages >> Different car >> Section 799 (Remote Keyless Entry System) >> Remote Keyless Entry System >> Pre-Diagnosis Inspection >> BCM Power Supply And Ground Circuit Inspection
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

BCM Power Supply And Ground Circuit Inspection

WARNING: This page is about a different car, the 2003 Nissan Altima. However, it is still accessible from the selected car via links, so may be relevant.
  1. FUSE INSPECTION 
    • Check the following fuses and fusible link in the fuse block (J/B) and fuse and fusible link box.
      Fig 1: Fuse Inspection Chart
      G02161895Courtesy of NISSAN MOTOR CO., U.S.A.

    OK or NG 

    1. OK: GO TO 2.
    2. NG: Replace the fuse or fusible link.
  2. POWER SUPPLY CIRCUIT INSPECTION 

    Disconnect BCM connector, and connect vehicle-side connector terminals shown below to positive probe and body around to negative probe. Measure voltage.

    Fig 2: Power Supply Circuit Inspection Chart
    G02161896Courtesy of NISSAN MOTOR CO., U.S.A.

    OK or NG 

    1. OK: GO TO 3.
    2. NG: Replace applicable power circuit harness.
  3. GROUND CIRCUIT INSPECTION 

    Check continuity between BCM vehicle-side connector and body ground.

    Fig 3: Ground Circuit Inspection Chart
    G02161897Courtesy of NISSAN MOTOR CO., U.S.A.

    OK or NG 

    1. OK: Power supply and ground circuits are normal.
    2. NG: Replace BCM ground circuit harness.