LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Nissan-Datsun >> 1983 >> 280ZX Base, 2.8 C, Standard >> Repair and Diagnosis >> Engine Performance >> System >> ECC CEC System >> Testing >> Component Testing >> Control Unit Ground Circuits
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Control Unit Ground Circuits

Measure resistance between ground and the following control unit connector terminals: 28, 36, 107, 109, 112 and 113. Continuity should be present in all cases. If not, repair harness.