LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mitsubishi >> 2015 >> Outlander ES >> Repair and Diagnosis >> Transmission >> Automatic Trans >> Continuously Variable Transaxle (CVT) Overhaul >> Pulley >> Disassembly And Assembly >> Post-Assembly Operation
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Post-Assembly Operation

  1. Assemble the power train.
  2. When the reduction gear assembly and the differential assembly are replaced, adjust the shim(s), and then assemble the converter housing.
  3. Assemble the control valve.
  4. Assemble the ancillary parts.