MULTIPORT Fuel Injection (3.8L) - Eclipse - Symptom Procedures
- Symptom Procedures
- INSPECTION PROCEDURE 1: Communication with Scan Tool Is Not Possible. (Communication with All Systems Is Not Possible.)
- INSPECTION PROCEDURE 2: Scan Tool Communication with ECM < M/T > or PCM < A/T > Is Not Possible.
- INSPECTION PROCEDURE 3: The Malfunction Indicator Lamp (SERVICE ENGINE SOON or Check Engine Lamp) Does Not Illuminate Right after the Ignition Switch Is Turned to the "ON" Position.
- INSPECTION PROCEDURE 4: The Malfunction Indicator Lamp (SERVICE ENGINE SOON or Check Engine Lamp) Remains Illuminated and Never Goes Out.
- INSPECTION PROCEDURE 5: Cranks, Won't Start
- INSPECTION PROCEDURE 6: Starts Up and Dies.
- INSPECTION PROCEDURE 7: Hard Starting
- INSPECTION PROCEDURE 8: Unstable Idle (rough idle, hunting).
- INSPECTION PROCEDURE 9: Idle speed is high (improper idle speed).
- INSPECTION PROCEDURE 10: Idle Speed Is Low (improper idle speed).
- INSPECTION PROCEDURE 11: When the engine is cold, it stalls at idle (die out).
- INSPECTION PROCEDURE 12: When the Engine Is Hot, It Stalls at Idle (die out).
- INSPECTION PROCEDURE 13: The Engine Stalls when Accelerating (pass out).
- INSPECTION PROCEDURE 14: The engine stalls when decelerating.
- INSPECTION PROCEDURE 15: Hesitation, sag or stumble.
- INSPECTION PROCEDURE 16: Acceleration shock.
- INSPECTION PROCEDURE 17: Deceleration Shock
- INSPECTION PROCEDURE 18: Poor acceleration.
- INSPECTION PROCEDURE 19: Surge.
- INSPECTION PROCEDURE 20: Knocking
- INSPECTION PROCEDURE 21: Dieseling (Run-on).
- INSPECTION PROCEDURE 22: Too high CO and HC concentration when idling
- INSPECTION PROCEDURE 23: Transient, Mass Emission Tailpipe Test Failure.
- INSPECTION PROCEDURE 24: Purge Flow Test of the Evaporative Emission Canister Failure.
- INSPECTION PROCEDURE 25: Pressure Test of the Evaporative System Failure
- INSPECTION PROCEDURE 26: Generator output voltage is low (approximately 12.3 volts).
- INSPECTION PROCEDURE 27: Fans (radiator fan, A/C condenser fan) are inoperative
- INSPECTION PROCEDURE 28: Power supply system and ignition switch - IG system.
- INSPECTION PROCEDURE 29: Fuel pump system.
- INSPECTION PROCEDURE 30: Ignition Switch-ST System. < M/T >
- INSPECTION PROCEDURE 31: Ignition Switch-ST System and Transmission Range Switch System < A/T >
- INSPECTION PROCEDURE 32: Ignition Circuit System.
- INSPECTION PROCEDURE 33: A/C system.