Main Relay Testing: Notes
- Check Voltage Supply At Battery
- Test for Voltage at Fuse 34 (With key on)
- Check Voltage at KL 30 of Main Relay
- Check operation of Relay (Using relay adapter)
- Ground signal from EMS2000
- Voltage Drops across Relay (Relay Energized and Not Energized)
- Perform TEST PLAN on Power Supply