July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!
Reading Operation Records Of PLG: Operation
The power liftgate control module sends an operation signal to the liftgate latch and lock actuator motor based on the power liftgate system operation signal and stores the operation record.