LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Mazda >> 2012 >> 2 L4-1.5L >> Repair and Diagnosis >> Transmission and Drivetrain >> Manual Transmission/Transaxle >> Input Shaft >> Service and Repair >> Primary Shaft Components Assembly
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Primary Shaft Components Assembly

PRIMARY SHAFT COMPONENTS ASSEMBLY

1. Assemble in the order indicated in the table.






3rd/4th Clutch Hub Assembly Note
















1. Install the synchronizer key springs in the clutch hub with the hooks in the grooves to hold the three synchronizer key in place.




2. Align the synchronizer ring grooves with the synchronizer key during assembly.

Bearing (Primary Shaft End) Assembly Note




1. Install the new bearing using a press.

3rd Gear, 3rd Synchronizer Ring, and 3rd/4th Clutch Hub Component Assembly Note




1. Install the 3rd gear, 3rd synchronizer ring, and 3rd/4th clutch hub component using a press.

4th Synchronizer Ring, 4th Gear, and Bearing (4th Gear End) Assembly Note




1. Install the 4th synchronizer ring, 4th gear, and a new bearing using a press.








2. Measure the clearance between the 3rd gear and 2nd gear.
- If it exceeds the maximum specification, reassemble the primary shaft component.








3. Measure the clearance between the 4th gear and bearing.
- If it exceeds the maximum specification, reassemble the primary shaft component.