October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Open Circuit
- If there is no continuity, the circuit is open. Repair or replace the wiring harness.
- Fuel injector (FP) terminal B and PCM terminal 2BB
- Fuel injector (RP) terminal B and PCM terminal 2BD
- Fuel injector (FS) terminal B and PCM terminal 2BC
- Fuel injector (RS) terminal B and PCM terminal 2AZ
- Fuel injector (FP) terminal A and main relay terminal C
- Fuel injector (RP) terminal A and main relay terminal C
- Fuel injector (FS) terminal A and main relay terminal C
- Fuel injector (RS) terminal A and main relay terminal C