October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Power and Ground Distribution: Testing and Inspection
RELAY INSPECTION
Type A
1.Verity the continuity between the relay terminals. -If not as indicated in the table, replace the relay.