October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
A/C Signal: Testing and Inspection
A/C Switch Testing:
1.Remove A/C switch and check continuity between terminals as indicated on image chart. 2.If not as specified, replace switch.