Test E2d (Checking PWS Continuity)
Using an ohmmeter, check for continuity between PWS connector pin No. 3 and ground, and pin No. 5 to ground. If there is continuity, replace pressure warning switch and pump motor relay. If there is no continuity, go to TEST E2e .