Installation [10/2015 - ]: Procedure
- INSTALL GENERATOR ASSEMBLY
- Using an E8 "TORX" socket wrench, temporarily install the generator assembly with the 2 stud bolts.
- Tighten the 2 stud bolts.
Torque: 10 N*m (102 kgf*cm, 7 ft.*lbf)
- Install the bolt B and 2 nuts.
Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf)
*1 Engine Wire Bracket - Install the engine wire bracket with the bolt A.
Torque: 43 N*m (438 kgf*cm, 32 ft.*lbf)
- Install the oil cooler tube with the bolt.
Torque: 6.0 N*m (61 kgf*cm, 53 in.*lbf)
- Connect the generator assembly connector.
- Connect the engine wire to the terminal B with the nut.
Torque: 12 N*m (122 kgf*cm, 9 ft.*lbf)
- Install the terminal cap.
- Connect the engine wire with the bolt.
Torque: 21 N*m (214 kgf*cm, 15 ft.*lbf)
- Engage the clamp.
- INSTALL FAN AND GENERATOR V BELT
Refer to INSTALLATION [10/2015 - ]
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Refer to PROCEDURE - Step 2
NOTE:When disconnecting the cable, some systems need to be initialized after the cable is reconnected.
Refer to INITIALIZATION [10/2015 - 09/2016] , or Refer to INITIALIZATION [09/2016 - 09/2017] , or Refer to INITIALIZATION [09/2017 - ]