LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Land Rover >> 2007 >> Range Rover (LM) V8-4.2L SC >> Repair and Diagnosis >> Power and Ground Distribution >> Fuse Block >> Service and Repair >> Engine Junction Box (EJB)
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Engine Junction Box (EJB)



Engine Junction Box (EJB)

Removal
1. Disconnect the battery ground cable.
2. Remove the engine control module (ECM) cover.
^ Remove the 10 screws.





3. Remove the engine junction box (EJB).
^ Disconnect the 4 electrical connectors.
^ Release the EJB positive battery cable.
^ Remove the 2 nuts.





CAUTION: Note the fitted position of the component prior to removal.

NOTE: Do not disassemble further if the component is removed for access only.

4. Remove the 5 relays.

Installation
1. Install the relays.
2. Install the EJB.
^ Tighten the nuts to 8 Nm (6 ft. lbs.).
^ Secure the EJB positive battery cable.
^ Connect the electrical connectors.
3. Install the ECM cover.
^ Tighten the screws to 2 Nm (1 ft. lbs.).
4. Connect the battery ground cable.