LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Kia >> 2009 >> Optima V6-2.7L >> Repair and Diagnosis >> Relays and Modules >> Relays and Modules - Power and Ground Distribution >> Relay Box >> Testing and Inspection >> ICM (Integrated Circuit Module) Relay Box
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

ICM (Integrated Circuit Module) Relay Box





Inspection

Adjustable Pedal
Check for continuity between the terminals.
1. There should be continuity between the No.5 and No.12 terminals when power and ground are connected to the No.6 and No.12 in the ICM relay A terminals.
2. There should be no continuity between the No.5 and No.12 terminals when power and ground are disconnected.

Seat Warmer
Check for continuity between the terminals.
1. There should be continuity between the No.7 and No.17 terminals when power and ground are connected to the No.14 and No.15 in the ICM relay A terminals.
2. There should be no continuity between the No.7 and No.17 terminals when power and ground are disconnected.