October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Radiator, Engine Cooling: Installation: 3.2L
Courtesy of CHRYSLER GROUP, LLC
|
- If removed, position the cooling fan (2) to the radiator and tighten securely the fasteners (1).
Courtesy of CHRYSLER GROUP, LLC
|
- Lower the radiator (1) into position.
Courtesy of CHRYSLER GROUP, LLC
|
- Connect the lower radiator hose (3) to the radiator (2) and verify the quick connect (1) is properly secured.
Courtesy of CHRYSLER GROUP, LLC
|
- Connect the upper radiator hose (2) to the radiator (3) and correctly position the clamp (1).
Courtesy of CHRYSLER GROUP, LLC
|
- Verify that the radiator (1) is seated into the lower mounts (2).
Courtesy of CHRYSLER GROUP, LLC
|
- Install the upper radiator isolators (1) to the radiator (2) and position the radiator into the mount.
Courtesy of CHRYSLER GROUP, LLC
|
- Install the upper left side radiator mount cover (2) and tighten the fasteners (1) to the proper torque specification. Refer to (TECHNICAL SPECIFICATIONS
).
Courtesy of CHRYSLER GROUP, LLC
|
- Install the upper right side radiator mount cover (2) and tighten the fasteners (1) to the proper torque specification. Refer to (TECHNICAL SPECIFICATIONS
).
Courtesy of CHRYSLER GROUP, LLC
|
- Install the condenser and transmission oil cooler (2) to the radiator and tighten the fasteners (1) to the proper torque specification. Refer to (TECHNICAL SPECIFICATIONS
).
Courtesy of CHRYSLER GROUP, LLC
|
- Position the transmission cooler lines (1) and securely tighten the fastener (2).
Courtesy of CHRYSLER GROUP, LLC
|
- Install the right hood support bracket (1) and tighten the fasteners (2) securely.
Courtesy of CHRYSLER GROUP, LLC
|
- Install the left hood support bracket (1) and tighten the fasteners (2) securely.
Courtesy of CHRYSLER GROUP, LLC
|
- Install the left (2) and right (1) radiator closure panels.
Courtesy of CHRYSLER GROUP, LLC
|
- Connect the ambient temp sensor (1) attached to the left radiator closure panel.
Courtesy of CHRYSLER GROUP, LLC
|
- Install the upper radiator cover (2) and securely tighten the fasteners (1).
Courtesy of CHRYSLER GROUP, LLC
|
- Position the wire harness to the upper radiator cover (3).
- Connect the wire connector (2) and secure the wire harness retainers (1).
- Install the front facia. Refer to FASCIA, FRONT, INSTALLATION
.
- Remove the support and lower the vehicle.
- Evacuate and fill the cooling system. Refer to STANDARD PROCEDURE
.
- Connect the negative battery cable. If equipped with an Intelligent Battery Sensor (IBS), connect the IBS connector.