Section 228 (T355 (Service Information)): Assembly: Assembly: Notes
WARNING: This page is about a different car, the 2013 Jeep Patriot and 2013 Jeep Compass. However, it is still accessible from the selected car via links, so may be relevant.
The T355 transaxle internal components can be serviced only by separating the gear case from the bellhousing case.
CAUTION:
The transaxle output shaft is serviced as a unit. No disassembly and reassembly is possible. Damage to the transaxle may result.
The sealant used to seal the transaxle case halves is MOPAR® Gasket Maker, Loctite® 518, or equivalent. The sealant used for the bearing end plate cover is MOPAR® RTV.
- Load Bench Fixture (special tool #6785, Assembly, Pallet) (4) with adaptors (special tool #9761-1, Pad, Shift Rail Support) (1), (special tool #9761-2, Spacer) (3), (special tool #9761-3, Spacer) (2), (special tool #9761-4, Stand Off) (5) and (special tool #9761-5, Stand Off) (6).
- Install the output (1) and input (2) shafts onto Bench Fixture (special tool #6785, Assembly, Pallet).
- Install shift blocker assembly and the 1-2 shift fork (5) onto the Bench Fixture (special tool #6785, Assembly, Pallet) (4).NOTE:
Adaptor (special tool #9761-1, Pad, Shift Rail Support) will slide shift blocker assembly and the 1-2 shift fork into the input and output shafts.
- Align all shift forks and slide into place.
- Install reverse brake blocking ring (2).
- Install reverse brake friction cone (1).
NOTE:
One shift fork bolt may need to be installed to align assembly.
- Install gear-case half (1) over Bench Fixture (special tool #6785, Assembly, Pallet) (2). Line up shift finger over 3-4 lug.
- Line up reverse brake friction cone lugs to the slots in the gear case. Verify reverse brake shim is in position.
1 - INPUT AND OUTPUT BEARINGS 2 - SEAL INSTALLER 4992-1 - Position input and output bearings (1) on the shafts. Using Seal Installer (special tool #C-4992-1, Installer) (2), install input and output shaft bearings (1) until they bottom into the case and against the shafts.
1 - SNAP RING PLIERS 2 - SNAP RINGS - Install new snap rings (2) at input and output bearings.
- Apply MOPAR® RTV sealant to end-cover outer edge and around bolt holes. Install end-cover onto gear case. Tighten end cover bolts to 25 N.m (225 in. lbs.).NOTE:
Install new O-rings on shift blocker assembly bolts.
- Install the three shift blocker assembly bolts (1) and tighten to 25 N.m (225 in. lbs.).
1 - SHIFT ASSEMBLY 2 - SELECTOR SHAFT - Remove gear case from Bench Fixture (special tool #6785, Assembly, Pallet).
- Install gear case in a holding fixture with end cover facing down.
- Turn selector link (2) into slot on blocker assembly.
1 - SPACER 2 - REVERSE IDLER GEAR - Push selector link spacer clip onto selector shaft. Install shift levers.
- Install reverse idler gear (2) and spacer (1).
1 - REVERSE IDLER SHAFT 2 - SPACER - Install reverse idler shaft (1).
1 - CASE 2 - REVERSE IDLER SHAFT 3 - REVERSE IDLER SHAFT BOLT NOTE:Install a new O-ring on reverse idler shaft bolt.
- Install bolt into reverse idler shaft (2) and tighten to 26 N.m (19 ft. lbs.).
1 - REVERSE FORK BRACKET 2 - REVERSE CAM BLOCKOUT 3 - SHIFT BLOCKER ASSEMBLY - Install reverse fork bracket (1).
1 - SCREWS (2) 2 - REVERSE FORK BRACKET - Tighten reverse fork bracket (1) bolts to 11 N.m (96 in. lbs.).
- Install the linkage tie bar (1).
- Install the linkage tie bar clips (1).
1 - INPUT SHAFT 2 - OUTPUT SHAFT 3 - DIFFERENTIAL ASSEMBLY 4 - GEARTRAIN HOUSING - Install differential (3) into gear case (4).