LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Jeep >> 2009 >> Compass Limited, ED3, AWD, Standard >> Repair and Diagnosis >> Engine Mechanical >> Mechanical >> 2.4L Engine (Service Information) >> Engine Block >> FRAME, Ladder >> Installation >> Installation
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

FRAME, Ladder: Installation: Installation

Fig 1: Sealing Ladder Frame
GC0084999Courtesy of CHRYSLER LLC
NOTE: When using RTV, the sealing surfaces must be clean and free from grease and oil.
NOTE: When using RTV, parts should be assembled in 10 minutes and tighten to final torque within 45 minutes.
  1. Apply a 2 mm bead of Mopar® engine sealant RTV or equivalent as shown in illustration.
    Fig 2: Ladder Frame Torque
    GC0085000Courtesy of CHRYSLER LLC
  2. Install bolts and tighten as shown in illustration following a two step method.
    • First: All to 10 N.m (89 in. lbs.).
    • Second: All to 26 N.m (19 ft. lbs.).
  3. Install balance shaft module. See Engine/Lubrication/PUMP, Engine Oil - Installation .
  4. Install oil pan. See Engine/Lubrication/PAN, Oil - Installation .