October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Installation
INSTALLATION 1.
Connect the electrical harness connector to the switch.
2.
Press the switch into place.
3.
Connect the battery negative cable.