LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Hyundai >> 2007 >> Veracruz GLS, AWD >> Repair and Diagnosis >> Engine Performance >> System >> Engine Control System Diagnosis (2 Of 2) >> DTC Troubleshooting Procedures >> DTC P0552 Power Steering Pressure Sensor/Switch Circuit Low Input >> Signal Circuit Inspection >> Check Open In Harness
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Check Open In Harness

  1. IG Key "OFF".
  2. Disconnect P/S pressure sensor connector and PCM connector.
  3. Measure the resistance between signal terminal of P/S pressure sensor harness connector and P/S pressure sensor signal terminal of PCM harness connector.

    Specification : Approx. below 1 Ω 

  4. Is the measured resistance within specification ?

    YES: 

    NO: