October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Park/Neutral Switch
Fig. 13 P/N Position Switch Inspection:
Disconnect connector and ensure there is continuity between terminals 10 and 11 when the shift lever is moved to neutral, Fig. 13.