October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Inspection Outline
- The components to be tested are indicated by a dotted line.
Courtesy of HONDA, U.S.A., INC.
|
- Troubleshoot any DTCs listed or indicated systems below first.
| Inspection Items |
Work Items |
| a |
PGM-FI Main Relay 1 |
Do the PGM-FI Main Relay 1 Test |
| b |
External Circuit |
+B_VBU, IG1_FI_ECU Circuit Inspection |
| +B_IGP Circuit Inspection |
| FI_MAIN_RLY_OUT, FI_MAIN_RLY_CL- Circuit Inspection |
| GND Circuit Inspection |
| c |
PCM |
PCM Inspection |