LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Genesis >> 2023 >> Electrified GV70 Advanced >> Repair and Diagnosis >> Accessories & Equipment >> Communication Devices >> POWERLINE Communication Module Diagnosis >> Check When Charging Is Not Possible >> DTC Information And Inspection >> Control Pilot (CP) Signal Inspection >> Control Pilot (CP) Signal Circuit Open Check
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Control Pilot (CP) Signal Circuit Open Check

  1. Ignition "OFF".
  2. Disconnect VCMS signal connector.
  3. Measure the resistance of both ends of the Control Pilot (CP) signal.

    Specification:  Approx. below 1Ω

    Multi tester (+) Multi tester (-)
    Charging terminal (Vehicle) CP CP VCMS signal terminal
  4. Is the measured value normal?

    YES 

    • Go to next procedure.

    NO