Installation Procedure
Communication Interface Module Battery (2) - Install
- Communication Interface Module Battery Bolt (1) - Install and tighten - Fastener Specifications
Telematic Control Module (1) - Install
- Connect the electrical connectors.
- WARNING:
Upon installing the floor duct to the side of the HVAC case, it is necessary to verify duct opening is completely installed, surrounding the HVAC case outlet port. Failure to do so could result in the duct falling downward, with the potential to interfere with driver's legs and gas/brake pedal operation.
Floor Front Air Outlet Duct - Left Side (1) - Install
Floor Front Air Outlet Duct Bolt (1) - Install and tighten - Fastener Specifications
Instrument Panel Lower Trim Panel Insulator (1) - Install
Instrument Panel Lower Insulator Retainer (1) - Install [ 2x ]
- Perform the necessary programming and setup procedure: Control Module References
CAUTION:
Refer to Fastener Caution .