LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> GMC >> 1991 >> Syclone V6-262 4.3L Turbo >> Repair and Diagnosis >> Heating and Air Conditioning >> Testing and Inspection >> Component Tests and General Diagnostics >> System Performance Test
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

System Performance Test

System Performance Test:






SYSTEM PERFORMANCE TEST

Tool Required:

- J21213-A Four Jack-Dual Range Temperature Tester.

Prior to the performance test, an Functional test should be performed. Refer to Functional Test. Functional Test/Check

1. Open doors or windows.

2. Position the right lever in the "NORM" mode.

3. Place the left lever in the cold (blue) position.

4. Place the blower switch at "HI."

5. Install J 21213-A at the instrument panel right outlet.

6. Start the engine and run at 2000 r.p.m.

7. After one minute, the minimum drop in temperature from the right outlet should be: (see accompanying figure).