LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Ford >> 2011 >> Edge SEL, FWD >> Repair and Diagnosis >> External Pages >> Different variant/trim >> Section 2 (Rear Drive HALFSHAFTS) >> Removal And Installation >> Constant Velocity (CV) Joint Boot >> Assembly
September 30: LEMON manuals is back up on a temporary server! Slowness is possible

Constant Velocity (CV) Joint Boot: Assembly

WARNING: This page is about a different variant/trim than selected.
  1. For the outboard CV joint, carry out the following:
    1. Slide the boot on the interconnecting shaft.
    2. Pack the outboard CV joint with 80 g (2.82 oz) of grease supplied in the boot kit.
    3. Spread any remaining grease evenly inside the boot.
    4. Install the boot by seating it in the groove in the CV joint housing.
      Fig 1: Identifying Boot And Outboard CV Joint
      G07397519Courtesy of FORD MOTOR CO.
  2. Using the Constant Velocity Joint Boot Clamp Installer, install the 79.6 mm (3.13 in) boot clamps on the large end of the boot.
    Fig 2: Installing Boot Clamps
    G07397520Courtesy of FORD MOTOR CO.
  3. Install the small clamp on the small end of the boot.
  4. NOTE: Install a new circlip every time the halfshaft is removed from the axle or damage to the component may occur.
    NOTE: Start one end of the circlip in the groove and work the circlip over the halfshaft and into the groove to prevent the circlip from overexpanding or damage to the clamp may occur.
    Fig 3: Locating Retainer Circlip
    G07397521Courtesy of FORD MOTOR CO.
  5. Install a new retainer circlip.
  6. Position the small clamp on the interconnecting shaft before installing the boot.
  7. Position the boot on the interconnecting shaft.
  8. Install the inner race and the retainer snap ring.
    Fig 4: Locating Retainer Snap Ring
    G07397522Courtesy of FORD MOTOR CO.
  9. Install the outer race with 8 balls.
    Fig 5: Locating Outer Race
    G07397523Courtesy of FORD MOTOR CO.
  10. Insert the assembly in the housing.
  11. Install the retaining ring.
    Fig 6: Locating Retaining Ring
    G07397524Courtesy of FORD MOTOR CO.
  12. For the inboard CV joint, carry out the following steps in sequence:
    1. Pack the inboard CV joint housing with 108 g (3.80 oz) of grease supplied in the boot kit.
    2. Spread any remaining grease evenly inside the boot and CV joint.
    3. Install the inboard CV joint housing, seating the boot in the groove in the housing.
  13. Set the halfshaft assembled length to specifications. For additional information, refer to SPECIFICATIONS  in this service information.
    1. Measure the entire assembly length.
    2. Push in or pull out on the inner joint as necessary to adjust the halfshaft assembled length.
    3. Hold the inner joint to prevent the assembled length from changing and insert a soft, flat tool between the boot and the joint to equalize the pressure.
      Fig 7: Adjusting Halfshaft
      G07397525Courtesy of FORD MOTOR CO.
  14. Using the Constant Velocity Joint Boot Clamp Installer, install the 77.5 mm (3.05 in) boot clamps on the large end of the boot.
    Fig 8: Installing Boot Clamps
    G07397526Courtesy of FORD MOTOR CO.
  15. Install the smaller boot clamp.
  16. Install the halfshaft assembly. For additional information, refer to HALFSHAFT  in this service information.