October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Test A: Speed Control Is Inoperative
PINPOINT TEST A: THE SPEED CONTROL IS INOPERATIVETest A1-A2:
Test A3-A4:
Test A5-A6:
Test A7-A9:
Test A10-A12:
Test A13-A14:
Test A15: