October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.
Control Switch Test
Fig. 76 Speed Control Main Switch Test:
Gain access and disconnect connector to speed control main switch and check for continuity between terminals as shown.