LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Eagle >> 1988 >> Premier ES >> Labor Times >> Other Variant >> Electrical >> Starter >> Starter Assembly >> Remove, Install, and Overhaul
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Starter Assembly: Remove, Install, and Overhaul

WARNING: This page is about the Premier LX, 2.5 Z, which is a different variant/trim than selected.
Includes: Turn Commutator, test Armature and Fields, replace Brushes, Bearings and Solenoid (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
In-Line4,2.5L Eng2.8B
Combination Procedure: STARTER FIELD COILS: Remove, Install, and Overhaul:
0.3B