LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Dodge and Ram >> 2018 >> Charger SXT >> Repair and Diagnosis (Single Page) >> Accessories & Equipment >> Drivers Assistance Systems - ADAS >> Electronic Control Modules (Service Information) >> Module, Vehicle System Interface (VSIM) >> Installation
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Module, Vehicle System Interface (VSIM): Installation

GC0170780Courtesy of CHRYSLER GROUP, LLC
  1. Position the Vehicle System Interface Module (VSIM) to the bracket with the upper guide (2) aligned with the VSIM bracket opening.
    GC0170627Courtesy of CHRYSLER GROUP, LLC
  2. Engage the upper VSIM guide to the slot opening (1) located at the top of the VSIM bracket.
    GC0170633Courtesy of CHRYSLER GROUP, LLC
  3. Seat the lower portion of the VSIM to the bracket and press inward until the lower guide (1) snaps into position.
    GC0170605Courtesy of CHRYSLER GROUP, LLC
  4. Connect all relevant wiring harness connections to the VSIM.
  5. Install the instrument panel end cap. Refer to CAP, INSTRUMENT PANEL END, INSTALLATION .
  6. Install the steering column opening cover. Refer to COVER, STEERING COLUMN OPENING, INSTALLATION .
  7. Connect the negative battery cable.