Grind Complete

Includes: Remove carbon, check surfaces for warpage, reface or replace Valves, resurface Valve Seats and clean Valve Guides. Adjust Valves (where applicable).

Applies ToNoteStandard HoursWarranty HoursSkill Level
2.7L Eng, Both Heads14.7A
Combination Procedure: VALVE SPRING ASSEMBLED HEIGHT: Correct:
Per 3 Springs0.2A