LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chrysler >> 2006 >> Sebring GTC >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery System >> Battery >> Installation
October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.

Battery System: Battery: Installation

  1. Position the battery in the battery tray.
  2. Connect the positive and negative battery cables. Torque to 16 N.m (150 in. lbs.).
  3. Connect the heater blanket cord, if equipped.
  4. Install the battery hold down and install the hold down bolt. Torque to 16 N.m (150 in. lbs.).
  5. Install battery splash shield. Refer to INTERIOR/EXTERIOR for the procedure.
  6. Connect the negative battery cable.