LEMON Manuals
: Even more car manuals for everyone: 1960-2025
Home
>>
Chrysler
>>
2006
>>
Sebring Base, 2D Convertible, 2.4 X
>>
Repair and Diagnosis
>>
Electrical
>>
Body Electrical
>>
Power Distribution
>>
Power Outlet
>>
Installation
July 1:
So it begins
. Don't worry, this is not in the correct legal jurisdiction!
Power Outlet: Installation
Install power outlet to instrument panel.
Install retainer to power outlet.
Connect wire harness connectors.
Install left side console lower cover.
Connect battery negative cable.