LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chrysler >> 2004 >> 300M Base >> Repair and Diagnosis >> Electrical >> Gauges >> Clock >> Installation
September 30: LEMON manuals is back up on a temporary server! Slowness is possible

Repair and Diagnosis: Electrical: Gauges: Clock: Installation

  1. On the bench, place the clock into place on the bezel and install the two retaining screws to analog clock (Figure ).
  2. Connect the one wire connector to the clock.
  3. Place bezel into place and firmly snap into place.
  4. Connect and isolate the negative battery remote cable to the remote terminal.
  5. Close hood.