LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chrysler >> 2000 >> Sebring V6-2.5L VIN N >> Repair and Diagnosis >> Starting and Charging >> Starting System >> Ignition Switch >> Testing and Inspection >> Component Tests and General Diagnostics >> Diagnostic Function
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Diagnostic Function

INPUT SIGNAL INSPECTION POINTS




When Using the Scan Tool
1. Connect the scan tool to the data link connector.

CAUTION: Always turn the Ignition switch off when connecting and disconnecting the scan tool.

2. If buzzer of the scan tool sounds once when a switch is operated (ON/OFF), the ECU input signal for that switch circuit system is normal.




When Using a Voltmeter
1. Use the special tool to connect a voltmeter between the ground terminal and the ETACS terminal of data link connector.
2. If the voltmeter indicator deflects once when a switch is operated (ON/OFF), the ECU input signal for that switch circuit system is normal.