LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chrysler >> 1997 >> Sebring Convertible L4-2.4L VIN X >> Repair and Diagnosis >> Power and Ground Distribution >> Testing and Inspection
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Power and Ground Distribution: Testing and Inspection

- Circuit Z12 which supplies a ground for the PCM high current drivers, terminates at the left strut tower.

- If the system loses ground for the Z12 circuit the vehicle will not operate.