LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chevrolet >> 2014 >> Express 1500 LS, AWD >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery, Charging System And Starting System >> Repair Instructions (Battery, Charging System And Starting System) >> Generator Replacement (V8) >> Installation Procedure (Battery, Charging System And Starting System)
September 30: LEMON manuals is back up on a temporary server! Slowness is possible

Installation Procedure (Battery, Charging System And Starting System)

    Fig 1: Generator Bolts
    GM385810Courtesy of GENERAL MOTORS COMPANY
  1. Install the generator to the bracket.
  2. CAUTION:

    Refer to Fastener Caution .

  3. Install the generator bolts and tighten to 50 N.m (37 lb ft).
  4. Fig 2: View Of Generator Cable & Nut
    GM395686Courtesy of GENERAL MOTORS COMPANY
  5. Install the generator cable to the generator, perform the following:
    1. Install the generator cable.
    2. Install the generator cable nut to the terminal stud and tighten to 9 N.m (80 lb in).
    3. Slide the boot over the terminal stud.
  6. Fig 3: Identifying Purge Solenoid Electrical Connector, Wiring Harness Nut & Generator Electrical Connector
    GM663672Courtesy of GENERAL MOTORS COMPANY
  7. Connect the generator electrical connector (3).
  8. Install the accessory drive belt. Refer to Drive Belt Replacement - Accessory .
  9. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection .