LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chevrolet >> 2011 >> Traverse LS, AWD >> Labor Times >> Engine Mechanical >> Mechanical >> Connecting Rod Bearings >> Remove & Replace
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Connecting Rod Bearings: Remove & Replace

Includes: R&I Oil Pan.

Applies ToNoteStandard HoursWarranty HoursSkill Level
AWD, Each Additional0.30.2A
AWD, OneIncludes: R&I Engine Assembly. Includes: R&I Engine Front Cover. Includes: Recover, Evacuate and Recharge Air Conditioning System.15.812.2A