LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chevrolet >> 2008 >> Equinox LTZ, AWD >> Repair and Diagnosis >> Electrical >> Charging Systems >> Battery, Charging System And Starting System >> Diagnostic Information and Procedures >> DTC C0900 >> Circuit/System Testing
October 30: LEMON manuals on a temporary server, it is slow and having issues, download the manuals you need! Later in November we will switch back to the fast server.

Circuit/System Testing

  1. Ignition OFF, disconnect the harness connector of the EBCM.
  2. Ignition ON, test for 11-16 volts between the B+ and the ground circuits of the EBCM.
    • If not within the specified range, test the circuits for an open, high resistance, or a short, or refer to Charging System Test .
  3. If all circuits test normal, replace the EBCM.