LEMON Manuals: Even more car manuals for everyone: 1960-2025
Home >> Chevrolet >> 2003 >> Cutaway 4.8 V >> Labor Times >> Engine Mechanical >> Mechanical >> Engine Assembly (Complete) >> Remove & Replace
July 1: So it begins. Don't worry, this is not in the correct legal jurisdiction!

Engine Assembly (Complete): Remove & Replace

Includes: R&I Engine Assembly. Transfer Fuel and Electrical Assemblies and Engine Mounts. DOES NOT include transfer of Manifolds, Valve Cover(s), Timing Cover(s), Oil Pan and/or Water Pump. NOTE: For bare Engine, refer to Long Block - R&R.

Applies ToNoteStandard HoursWarranty HoursSkill Level
V8, w/Dual AlternatorsIncludes: Recover, Evacuate and Recharge Air Conditioning System.18.49.9B
V8, w/o Dual AlternatorsIncludes: Recover, Evacuate and Recharge Air Conditioning System.17.99.9B